Ronno6
Lawn Addict
- Joined
- Apr 8, 2016
- Threads
- 24
- Messages
- 1,933
Shop air compressor
Well, check valve is in
Head valves have been replaced.
New fittings on the cooler
Moved it about 6"
replumbed
RE-wired cuz it was trippin' the 20A breaker.
8ga to sub panel w/40A breaker
10ga from sub panel to compressor w/30A breaker.
So far, so good!
Still not sure if unloader is working correctly, but it does bleed down high pressure in about 5 seconds after pump stops.
Close enough for government work..............
Well, check valve is in
Head valves have been replaced.
New fittings on the cooler
Moved it about 6"
replumbed
RE-wired cuz it was trippin' the 20A breaker.
8ga to sub panel w/40A breaker
10ga from sub panel to compressor w/30A breaker.
So far, so good!
Still not sure if unloader is working correctly, but it does bleed down high pressure in about 5 seconds after pump stops.
Close enough for government work..............