Garage door news flash
Door #2 is in!
Received the new torsion spring yesterday (replacing the broken one) installed and tensioned.
I had installed the opener the previous day.
Outlet box installed in ceiling, I only need to route the power down a rafter.
Control wiring should be here today.
I'm gonna make the top panel and install.
The system should be up and operating by the end of the day.
Then, just awaiting remote for door #2.
All should be complete except for the aluminum skins.
This is somewhat unusual for me......I usually lose interest after I see that the project is doable.
For me, the fascination is in the figuring out HOW to do something, rather than actually DOING it.......