Bison
Well-Known Member
- Joined
- Mar 22, 2011
- Threads
- 11
- Messages
- 679
No,not by a long shot.
About 3 months behind.
I'm in the process of building this here shop and need to finnish the electric,put the insulation and sheeting on,install the heater and overhead doors and add a gravel entree pad.I can't afford to have it hired done either:frown:
That is outside of hauling 600 bales of hay home from the field,cutting/hauling/stacking this winters fire wood and sorting my buffalo.
Winter is only 3-4 weeks away.:confused2:
About 3 months behind.
I'm in the process of building this here shop and need to finnish the electric,put the insulation and sheeting on,install the heater and overhead doors and add a gravel entree pad.I can't afford to have it hired done either:frown:
That is outside of hauling 600 bales of hay home from the field,cutting/hauling/stacking this winters fire wood and sorting my buffalo.
Winter is only 3-4 weeks away.:confused2: