I have a Poulan PRO 22VA48 and I am looking for the wiring diagram
I found this one but (i think) is not the correct one:
I have a ROS (Reverse Operation System) position on the main switch, I do not see it in the diagram
I think I do not have a fuel solenoid ( but i am not sure)
What is the meaning of MAKE in the switch? and Run Override? -bottom left in the diagram-
thanks!
I found this one but (i think) is not the correct one:
I have a ROS (Reverse Operation System) position on the main switch, I do not see it in the diagram
I think I do not have a fuel solenoid ( but i am not sure)
What is the meaning of MAKE in the switch? and Run Override? -bottom left in the diagram-
thanks!